Improving the Performance of the Transportation Industry Through Training
 
Search for a Course
more search options
Connect with us
Receive regular email updates
Find Training
Browse Upcoming Sessions
         

Web Conference Information

Register for a Web Conference

Title:  SR500 NHI Innovations: To Accelerate Bridge Construction or not
Date/Time:  5/19/2011 2:30 PM - 4:00 PM Eastern Time
Description:  To Accelerate Bridge Construction or not. A Planning Phase Decision Tool for ABC Accelerated Bridge Construction (ABC) is recognized as an important method for bridge owners to accelerate the delivery of highway bridge projects. ABC uses both new technology and innovative project management techniques to reduce the impacts of bridge construction projects on the public and to reduce total project costs. In early stages of a construction project, engineers need to assess whether elements of ABC are achievable and effective for a specific bridge location. Use of decision-making tools in early stages of planning can help decision makers implement effective solutions. Existing cost analysis tools in the public domain arena are found to be lacking. Available project cost data are inconsistent and insufficient and not well documented. This makes ABC project decision making somewhat difficult when reliable cost data are not readily available in the early stages of planning a project. There is now a tool available to assist bridge owners with their decision using either qualitative or quantitative data. This webinar will present a set of decision making tools that were developed in FHWA-sponsored pool funded study TPF 5(221). This tool set was prepared for transportation specialists and decision-makers to determine if ABC should be the preferred method of construction rather than conventional construction for a given bridge replacement or rehabilitation project. The tool set is user-friendly, accommodates a range of construction situations, transparent as to the method of calculation and decision criteria, and customizable to maintain owner's relevance. These elements are important considerations as project decision making is influenced by stakeholders from diverse (sometimes opposing) disciplinary perspectives. The analysis tool utilizes the tiered level criteria as established by the technical advisory team and allows an end user to define the qualitative or quantitative value between any two main and sub-criteria. Presenters: Benjamin Tang, P.E. Bridge Preservation Manager, ODOT Dr. Toni Doolen, PI, Associate Professor, Oregon State University, Mechanical, Industrial and Manufacturing Engineering Department
Sorry, this Web conference event has already occurred. Registration is no longer allowed.
    

More Information

Please complete the registration process by filling in the information on this page. The registration process will not be complete if your e-mail address is not correct.

If you will be joining this event with a group, you only need to register once. Each computer connection only requires one registration.

For more information, view a tutorial on how to join a Web conference.

Submit Feedback or Questions
Please submit feedback regarding the NHI Web site and services.
Document Disclaimer
The documents available on this site are for printing purposes only. If you have any problems accessing information on this site, please contact nhicustomerservice@dot.gov for assistance.